A new bridge was required in a remote location at Falls Creek as part of their mountain bike trail redevelopment. KUSCH designed a prefabricated steel truss bridge to be lifted in by helicopter, and capable of supporting mtb riders and a 2t excavator for maintenance. The design included Fibre Reinforced grating, and concrete footings.
Custom menu section
This is off canvas menu widget area. To enable it add some widgets into Appearance – Widgets – Menu Section, and go to Customizer – Main menu to set the icon position.