Design of 5 bridges along the Great Valley Trail, a 26km sealed, family-friendly trail that connects Bright to Harrietville.
Bridges included a trafficable steel/concrete bridge, trafficable culvert, two trafficable 18m steel brdiegs and one 24m steel pedestrian bridge
Catchment analysis & site surveys
Detailing of bridges using BIM software
Design Achievements: Development of fit for purpose transportable modular bridge sections which can be transported to site and into position within the access constraints
Design Highlights: Supporting the local community with new infrastructure
Design Considerations:
Ensuring the bridges have sufficient freeboard to maintain operation during flood events
Ensuring bridges can support emergency service vehicles responding to incidents
Custom menu section
This is off canvas menu widget area. To enable it add some widgets into Appearance – Widgets – Menu Section, and go to Customizer – Main menu to set the icon position.