Scope: Clover Power Station is undergoing a turbine upgrade, in this project KUSCH has the following scope:
Designing an increase in tail bay wall height to generate back pressure required by new turbines
Design of new transformer bund
Design verification of loads from new turbines on existing structure
Design of penetrations in the existing floor slab
Design Considerations:
Coordinating the new and existing structure, which was originally built in 1944
Verifying capacity of existing reinforced concrete structures to modern standards
Testing of concrete to understand remaining design life alongside capacity
High hydrostatic loading and dynamic loading
Coordination with external CFD consultant to ensure optimum turbine operation through tail bay outflow