Determination of appropriate seismic loads for this project
Structural design of services within a prefabricated medical gas container
Seismic design and certification of mechanical, electrical, fire protection and hydraulic services
Design considerations:
This region experiences frequent earthquakes, and building services must be designed to accommodate large seismic design loads
Due to COVID 19 travel restrictions, physical inspections were not possible. KUSCH worked alongside the site team to ensure and remotely certify that the installed seismic bracing achieved the seismic design requirements.
Project Features: The Angau Memorial Hospital provides critical services for the city of Lae, which is one of the largest in Papua New Guinea, as well as the broader Momase region.
Custom menu section
This is off canvas menu widget area. To enable it add some widgets into Appearance – Widgets – Menu Section, and go to Customizer – Main menu to set the icon position.