KUSCH were engaged to design a 100m pipe riser from the L5 plantroom to the L29 plantroom supplying chilled water at Chevron tower. The client proposed a design that included flexible bellows, however given the unique design without any pipe branches between the plantrooms, KUSCH were able to anchor the riser centrally from the core wall, and all of the movement was accommodated at the top and bottom of the riser using spring hangers and flexible Victaulic couplings.
>>>